Wednesday, November 27, 2013

How Could Such a Small Room Require so Many Decisions?

4th Week of November
 

Somehow many of the material decisions for the Powder Room took us a while to finalize.  We ended up with a "black and white" scheme for this tiny little room.  We bought almost all the materials ourselves, instead of through the Builder.  I purchased the vanity base from "Restoration Hardware", the  "carrara marble" mosaic wall tile from "The Tile Store", and the mirror from Dulles Electric!  The faucet is mounted on the wall.  The sink will be a "vessel" sink, sitting on top of the countertop.  The sink is in the house, but we are waiting for the countertop, which will be installed some time next week.

Counter Point

4th Week of November

Kitchen - so close to being done!
Lots of progress has been made with the Kitchen!  The granite countertops were installed today.  We picked a granite called "silver gray".  The finish is "honed".  The peninsula light is in, the appliances are in, and undercabinet lights are in.  Many of the surfaces have been cleaned.  We still need outlet cover plates, and base trim paint in some places.  The sink is sitting on top of the counter.  It appears that plumbing connections will be one of the last things to happen in the house.

Kitchen appliances and lots of cabinets!
Most of the appliances are BOSCH, but the refrigerator is a JENN AIR.  I can't believe how perfectly the refrigerator fits.  We decided against the very popular "French door" refrigerator with the freezer on the bottom.  We prefer to have the side-door freezer.  We also decided against a built-in microwave.  Instead we will purchase a countertop microwave and set it in the corner.

Kitchen counter - waiting for sink and cooktop
I'm not sure if I've mentioned previously that we had a cabinet order mishap.  The wrong sink base (and adjacent cabinet) were ordered.  The correct cabinets are in fabrication but I have no idea when they will arrive; most likely NOT before we move in.  The cabinet bases will be cut to allow the sink to fit.  When the replacement cabinets arrive the builder will pull out the wrong bases and push in the correct ones.  He assures me they do this kind of thing regularly with kitchen renovations and have no worries about making it all right.

Desk with Countertop in place
The countertop for the desk was also installed today.  We had a cabinet order mishap at the desk area as well.  All the wall cabinets are supposed to be the shorter height.  The Builder heard today that the correct cabinets are being shipped from the factory on Monday, so hopefully by next Friday we will have the right cabinets on the wall.

And so it goes.  Point counterpoint.

The Blues

4th Week of November

 

I can't explain what was going on with the lighting this afternoon, but it literally looked blue!  It was about 4:00 pm and overcast.  It has been raining almost constantly for the past 36 hours, although it is just a drizzle now.

The Builder's crew of 3 - 4 guys spent a lot of time CLEANING the house today.  The protective plastic film is being removed from the windows.  There are still many little things to be done around the house, but from some vantage points it sure looks done.

Sunday, November 24, 2013

Working Weekend - maybe the last?

November 23rd - Saturday

Boxes filled with wood floor planks arrived at the house over a week ago.  But the HVAC system needed to be running, and then the wood needed a few days to acclimate to room temperature.  Finally, on Friday, a crew of about eight guys showed up to install the wood flooring. 

Living Room, looking toward Office and Family Room
By the end of Friday almost all the wood flooring was installed!  There was a lot of wood dust all over the floors.  The only room on the 1st floor that doesn't get wood flooring is the Family Room.


Saturday about four flooring guys showed up.  They finished small areas and did the planking on the stair landings.  They also started preparing the "shoe mold", which is the trim piece that bridges the gap between the edges of the floor boards and the wall base trim.

Master Bedroom and Hallway
We also have all the ceiling fans up in the bedrooms.  We saved all our fans from the old house; its kind of amazing that we managed to save all the parts and pieces for five (5) fans.

Alex's Bedroom
Only the Master Bedroom and Hallways get wood flooring on the 2nd floor.  All the other bedrooms will be carpeted; probably the last thing that will happen.  But as you can see above, shelving is installed in the closets, ceiling fans are installed, doors and hardware are in place, and the smoke detectors (with red temporary cover) are installed.  These rooms just need their final coat of paint and they are done!

Pennsylvania Blue Slate

November 23rd - Saturday


I honestly do not think we could have been any luckier with the seasonal weather during our construction.  It is only now truly "cold" out, and the ground certainly has not frozen yet.  Good thing too, because the final grading - no small task - has been in progress this past week.  Once the grades were final along the front of the house the sidewalk construction began.


We had a little go-around about the riser material for the front steps.  The drawings call for slate pavers on horizontal AND vertical surfaces, but the mason just started laying in stone!  We stopped the work so that we could think about it for a day.  We ended up deciding stone is good, but did ask that they vary the sizes, which they did.  Other finishing touches that occurred this past week were the staining of the entry ceilings and installation of the light fixtures.  Still to be completed is the panel trim boards to the sides of the door.  Oh, and we also have a door bell now :o)


I think it is the same masons doing the sidewalks as did the house stone.  I really like these guys.  They take their time, are meticulous with the details, and definitely know what they are doing.  The sidewalk is Pennsylvania Blue Stone.  This same stone will be used at the hearth of the fireplace!


There isn't much sidewalk to finish, but they did take Sunday off, so I expect them to finish tomorrow.

Some of the other exterior details to be completed are installation of the gutters and downspouts, and finishing the railing at the side entry.  Also, you can see in the upper corner of the picture above the wired location for a flood lamp not yet installed.  Exterior electrical outlets need to finished as well.  We are getting down to the details.

Saturday, November 23, 2013

Tools of the Trade

3rd Week of November

Over the past two months we have seen tool migration throughout the house.  It had gotten to the point that it was hard to see daily progress through all the "stuff" strewn all over the rooms.  I have joked with the Builder that he probably has a $100,000 worth of tools in the house.  Today is a bit of a turning point.  With the installation of the wood flooring we are - believe it or not - coming very close to being done!  There are miscellaneous little things to be finished, but the list is getting smaller by the day.


Loading up the Car
I went over to the house to take pictures of the sidewalk work and found one of the Builder's guys packing up his car!  He is moving tools OUT of the house - seems like a real sign that the end is near.  Tomorrow is a big cleaning day, before the painters come on Monday for the final coat of paint.

More tools, lined up in the entry hall
As soon as I walked into the house through the Garage there were even more tools assembled, waiting to be moved out I guess.  By the way, the floor in the entryway is slate.  It has been covered with brown "construction" paper since it was grouted, to protect it.

Kitchen clutter
There is also brown paper over the Kitchen tile floor.  There isn't too much clutter in the Kitchen at this point.  The appliances arrived today, and we are hoping to see the granite countertop on Wednesday (day before Thanksgiving? - probably a very slim chance that will happen).

Believe it or not, the pile of tools is getting smaller
The Family Room has been a staging area for some time.  At this point the room almost looks clean!  This is the one room on the first floor that does not get wood flooring; it will be carpeting.  So that kind of explains why it has been used as a staging area, particularly in the past few days, when the wood flooring was being installed.

Appliances, sitting in the Eating Area
The Builder has been working every Saturday for the past month.  And tomorrow - Sunday - he will be back to install the appliances.  While they haven't overtly stated it, I think the plan is to be as complete as possible by Wednesday.  We are going into the last phase of the project - FINAL INSPECTIONS!  But I will talk about that in my next blog.


Friday, November 22, 2013

Out of the Darkness . . .

3rd week of November

There really is a lot happening at the house now.  While this has consistently been the case, some "new" things are easy to spot while others are not.  I continue to be amazed by how much Steve and I have to do to keep the pace of the construction moving as quickly as possible, but I will save that for another blog, hopefully this weekend.

I am a real "daylight" kind of person, and the change of seasons combined with daylight savings time (what a misnomer), means that I literally cannot SEE the house much at all during the week.  I leave home just before dawn and arrive home after dusk.

Light fixtures arrived on Tuesday, and Wednesday almost all of them were installed!

Looking into the Foyer from the Dining Room
We had to give the Builder all of our light fixture selections for purchasing through a distributor.  I was focused on what I consider "decorative" lights, and didn't realize that we also have to select the "utilitarian" lights, for rooms like closets, garage, and laundry room.  I thought the Builder would just give us something generic from what we indicated on the drawings.  I think Steve and I will be at Home Depot or Lowes this weekend buying these "unseen" light fixtures.

Looking toward Kitchen from Eating Area
As you can see above, most of the lighting in the Kitchen will be downlights.  There is a pendant fixture that will hang over the peninsula.  I assume they will install that one last, because it could be damaged with all the work still to occur in the Kitchen.  You can also see the range hood being installed.

View of Eating Area & Fireplace, from Kitchen
(Yikes, my picture is crooked - sorry.)  You can see the pendant light for our eating area above.  Unfortunately the electrician did not quite get the placement of the light right.  It is supposed to align with the center of the fireplace!  I pointed it out to the Builder and he was quick to agree and say it will be corrected.  You can also see that the fireplace stonework is complete.  I think the fireplace is almost operational - maybe even today they will "fire it up".

Side note:  Steve and I work in the construction world, so we know only too well that there has been a long term change in the level of ability by the everyday workers, particularly the subcontractors.  They don't seem to care very much about the end result of their work.  And they definitely can never seem to see the "big picture", or even ask themselves questions about what they are doing and how does it need to coordinate with other work.  As ceiling junction boxes were being installed (2 months ago) I noticed several locations that were wrong.  I have dimensioned locations on the drawings for many of the downlights and they still got several of them wrong!  I walked the house a couple of times with the Builder to review and direct relocations.  Somehow neither of us noticed the junction box location for the Eating Area was off.  In hindsight we attribute the oversight to the fact that the fireplace was not framed out until very recently, and the drawings show alignment with the centerline of the fireplace.  Oh well.  Just another "fix".

I apologize for my pictures.  I don't have many this time, but will make up for it this weekend.  Appliances are being delivered tomorrow.  And wood flooring installation starts today!